Reconstruction of the boiler room of Zhytomyr Regional Psychiatric Hospital №1 with transfer to biomedical and household waste and installation of modern flue gas purification systems. The project is designed to economically address the problem of increasing the amount of hazardous waste in connection with the COVID-19 pandemic.

Callback